GIFSQ Tools · Module 15 — Metrology, Validation & Laboratory Accreditation · Tool 282 of 500
Build a measurement uncertainty budget from your standard uncertainty components: combined uncertainty, expanded uncertainty, and the share of the largest contributor — the table every ISO/IEC 17025 uncertainty budget needs.
Try sample values — fills the form with the worked example below.
Method: Uncertainty budget per Eurachem/CITAC Guide CG4 and GUM (JCGM 100): list every component as a standard uncertainty, combine by root-sum-of-squares, and identify the dominant contributor so improvement effort goes to the right place.
Assumptions: the components are independent standard uncertainties in the same unit; each component already includes its own divisor (for example a rectangular distribution divided by √3).
Limitations: a budget is only as good as its component list — a missing source (sampling, preparation, calibration) is not detected by the arithmetic; correlated components need covariance terms.
Rounding: combined and expanded uncertainty to 2 decimal places; largest contributor to 2 decimal places; intermediates unrounded.
This is a calculation aid, not a laboratory report — confirm against your accredited method before citing a value.
Enter values above to see results.
If one contributor is above 80%, improving that single source is the fastest way to shrink the budget. Tool 282 of 500 — GIFSQ