Login Register

Access the GIFSQ Portal

Select your user type to log in or register a new account.

Student Portal

Access your food safety courses and exams.

Instructor Portal

Manage courses, view student submissions, and grade quizzes.

Company Portal

Manage corporate setup, view employee logs, and access QA services.

Home / Resources / Tools Hub / Test Assignment Manager

Test Assignment Manager

Interactive Tool Free Resource

GIFSQ Tools · Module 14 — LIMS & Quality · Tool 265 of 500

Share a batch of samples across the analysts: total tests, total analyst-hours, hours per analyst, and whether the work fits the days available.

Try sample values — fills the form with the worked example below.

–
Total tests
–
Total hours
–
Hours per analyst
–
Workdays needed
Equation: Total tests = samples × tests per sample. Total hours = total tests × minutes per test ÷ 60. Hours per analyst = total hours ÷ analysts. Workdays needed = hours per analyst ÷ 7.5 (one standard workday). The batch fits when workdays needed is at or under the workdays available.
Method: Workload assignment per ISO/IEC 17025:2017, clause 6.2 (personnel): work is assigned only to competent personnel, and the load is checked against the people and days available before the batch is promised.
Assumptions: every test takes the stated minutes on average; analysts work a 7.5-hour day on this batch only; set-up, review and reporting time are not included unless added to the minutes per test.
Limitations: an even split is only a plan — real benches differ in speed and interruptions, so the per-analyst figure is a planning average, not a promise.
Rounding: hours to 2 decimal places; workdays to 2 decimal places; intermediates unrounded.
This is a calculation aid, not a laboratory report — confirm against your accredited method before citing a value. Records are kept only in this browser on this device (localStorage); this is a device-only record aid, not a shared multi-user LIMS, and nothing is sent to any server.
Worked example: 20 samples × 4 tests at 30 minutes each, 2 analysts, 5 days: 80 tests, 40.00 hours in total, 20.00 hours per analyst, 2.67 workdays — fits the 5 days available.

Enter values above to see results.

If the batch does not fit, add analysts, split the batch, or agree a later due date before accepting it. Tool 265 of 500 — GIFSQ