Login Register

Access the GIFSQ Portal

Select your user type to log in or register a new account.

Student Portal

Access your food safety courses and exams.

Instructor Portal

Manage courses, view student submissions, and grade quizzes.

Company Portal

Manage corporate setup, view employee logs, and access QA services.

Home / Resources / Tools Hub / Production Yield Dashboard

Production Yield Dashboard

Interactive Tool Free Resource

GIFSQ Tools · Module 18 — Manufacturing, Costing & Supply Chain · Tool 344 of 500

Check a production run at a glance: yield, loss and scrap from the material in and the good product out — the three numbers every shift report needs.

Try sample values — fills the form with the worked example below.

–
Yield (%)
–
Total loss (%)
–
Scrap (%)
Equation: Yield (%) = good output ÷ material in × 100. Total loss (%) = (material in − good output) ÷ material in × 100. Scrap (%) = scrap ÷ material in × 100.
Method: Mass-balance yield: what went in, what came out as saleable product, and what was weighed as scrap. The gap between total loss and scrap is unweighed loss — evaporation, dust, spills and line hold-up.
Assumptions: material in and good output are in the same unit and weighed on the same basis (both wet, or both dry); scrap is a weighed figure, not an estimate.
Limitations: yield says nothing about quality — a batch can yield well and still fail specification; moisture change during processing shifts the balance, so compare like with like.
Rounding: percentages to 2 decimal places; intermediates unrounded.
This is a calculation aid, not a laboratory report — confirm against your accredited method before citing a value.
Worked example: Material in 1,000 kg, good product 920 kg, scrap 50 kg: yield = 92.00%; total loss = 8.00%; scrap = 5.00% — the other 3.00% is unweighed loss.

Enter values above to see results.

Track yield by product and by shift: a slow drift down is usually a process problem, not a weighing error. Tool 344 of 500 — GIFSQ