Login Register

Access the GIFSQ Portal

Select your user type to log in or register a new account.

Student Portal

Access your food safety courses and exams.

Instructor Portal

Manage courses, view student submissions, and grade quizzes.

Company Portal

Manage corporate setup, view employee logs, and access QA services.

Home / Resources / Tools Hub / Factory KPI Dashboard

Factory KPI Dashboard

Interactive Tool Free Resource

GIFSQ Tools · Module 18 — Manufacturing, Costing & Supply Chain · Tool 360 of 500

One view of the factory week: first-pass yield, schedule attainment and on-time delivery — three key performance indicators, plus an overall score that averages them.

Try sample values — fills the form with the worked example below.

–
First-pass yield (%)
–
Schedule attainment (%)
–
On-time delivery (%)
–
Overall score
Equation: First-pass yield (%) = good units ÷ total units × 100. Schedule attainment (%) = actual output ÷ planned output × 100. On-time delivery (%) = orders on time ÷ total orders × 100. Overall score = the mean of the three.
Method: Factory KPI dashboard: the three headline indicators used across food manufacturing — yield (quality), attainment (the plan was met) and on-time delivery (the customer got it when promised). The overall score is a simple mean so a weak indicator cannot hide behind a strong one.
Assumptions: good units are those that passed first time without rework; planned output is the agreed schedule for the same period; on-time means delivered on or before the promised date.
Limitations: the mean overall score treats the three indicators as equally important — weight them when one matters more to the business; the dashboard shows the week, not the trend — compare with last week before acting.
Rounding: each indicator and the overall score to 2 decimal places; intermediates unrounded.
This is a calculation aid, not a laboratory report — confirm against your accredited method before citing a value.
Worked example: Good 950 of 1,000 units, actual 980 of 1,000 planned, 47 of 50 orders on time: first-pass yield = 95.00%; attainment = 98.00%; on-time = 94.00%; overall = 95.67%.

Enter values above to see results.

The overall score is only as honest as the weakest indicator — read all three before celebrating the average. Tool 360 of 500 — GIFSQ