Login Register

Access the GIFSQ Portal

Select your user type to log in or register a new account.

Student Portal

Access your food safety courses and exams.

Instructor Portal

Manage courses, view student submissions, and grade quizzes.

Company Portal

Manage corporate setup, view employee logs, and access QA services.

Home / Resources / Tools Hub / Calibration Scheduler

Calibration Scheduler

Interactive Tool Free Resource

GIFSQ Tools · Module 14 — LIMS & Quality · Tool 273 of 500

Check a calibration: the days left until it is due, the drift of the latest check against the reference, and whether the drift is inside tolerance.

Try sample values — fills the form with the worked example below.

–
Days to calibration
–
Drift (%)
–
Calibration due
–
Drift inside tolerance
Equation: Days to calibration = last calibration day + interval − today. Drift (%) = (reading − reference) ÷ reference × 100. The calibration is due when the days left are 0 or fewer; the drift is inside tolerance when |drift| is at or under the tolerance.
Method: Calibration scheduling per ISO/IEC 17025:2017, clause 6.4 (equipment) and clause 6.5 (metrological traceability): equipment is calibrated before use on a set interval, and a check standard reading outside tolerance takes the item out of service.
Assumptions: the interval is the laboratory interval for this item; the tolerance is the maximum drift the method allows.
Limitations: a check inside tolerance does not extend the calibration due date — the interval still runs from the last full calibration.
Rounding: drift and tolerance to 2 decimal places; days to calibration is a whole number; intermediates unrounded.
This is a calculation aid, not a laboratory report — confirm against your accredited method before citing a value. Records are kept only in this browser on this device (localStorage); this is a device-only record aid, not a shared multi-user LIMS, and nothing is sent to any server.
Worked example: Calibrated day 100 on a 90-day interval, today day 150, check reading 100.4 against a 100 reference with ±1% tolerance: 40 days left, drift 0.40% — inside tolerance and not due.

Enter values above to see results.

When a check fails tolerance, quarantine the equipment and review every result it produced since its last passing check. Tool 273 of 500 — GIFSQ