Internal Food Safety Audit Template (Free)
Audit – Internal (Full System)
The full internal audit is your system’s annual health check – every clause, every area, no shortcuts. Done properly, it finds the gaps before your customers or your certification body do.
A good auditor is curious, not hostile. Record what you actually observed, note the evidence, and agree corrective actions with the auditee before you leave the area.
1. Audit details
| Field | Details |
|---|---|
| Audit title | Audit – Internal (Full System) |
| Audit no. | [AUD-YYYY-###] |
| Date(s) | [YYYY-MM-DD] |
| Auditor(s) | [Name(s)] |
| Area / process audited | [Area] |
| Auditee(s) | [Name(s) / Title(s)] |
2. Audit criteria
Reword the clauses to match your standard if you need to – but keep the numbering stable so you can trend findings over time.
| Ref | Requirement | C / NC / N/A | Evidence seen | Corrective action ref |
|---|---|---|---|---|
| 1.1 | Food safety policy is documented, signed, and communicated to all staff. | |||
| 1.2 | Management review is conducted at planned intervals with actions tracked to closure. | |||
| 1.3 | Responsibilities and authorities for food safety are defined and understood. | |||
| 2.1 | HACCP plan covers all products and processes; scope and product descriptions are current. | |||
| 2.2 | Hazard analysis is complete and reviewed; significant hazards have controls. | |||
| 2.3 | CCPs have validated critical limits, monitoring, and corrective actions. | |||
| 2.4 | HACCP verification activities are performed and recorded as scheduled. | |||
| 3.1 | PRPs are documented, implemented, and verified (cleaning, pest, maintenance, hygiene). | |||
| 3.2 | Supplier approval and monitoring program is current and effective. | |||
| 3.3 | Traceability is tested and achieves the defined time target. | |||
| 3.4 | Recall/withdrawal procedure is documented, tested, and contacts are current. | |||
| 4.1 | Training program covers induction, refresher, and role-specific needs; records are complete. | |||
| 4.2 | Allergen management controls are implemented and verified. | |||
| 4.3 | Calibration program covers all food-safety measuring equipment; certificates are current. | |||
| 4.4 | Nonconforming product is identified, segregated, and dispositioned with records. | |||
| 4.5 | Corrective action process addresses root cause; effectiveness is verified. | |||
| 4.6 | Internal audit program is risk-based, independent, and findings are closed on time. | |||
| 4.7 | Document control ensures current versions are in use; obsolete documents are controlled. | |||
| 5.1 | Site tour confirms GMP: building, equipment, hygiene, and housekeeping standards. | |||
| 5.2 | Previous audit findings were closed effectively with no recurrence. |
3. Summary
- Total clauses checked:
- Compliant: Non-compliant: N/A:
- Overall result: [Pass / Conditional pass / Fail – define your scoring rule here]
- Key strengths:
- Priority corrective actions: [list CAR references]
Approval and control
| Role | Name | Signature | Date |
|---|---|---|---|
| Prepared by | [Name] | [Signature] | [Date] |
| Reviewed by (QA) | [Name] | [Signature] | [Date] |
| Approved by | [Name] | [Signature] | [Date] |
Keep completed forms for [Define retention period, e.g., 2 years beyond shelf life] at [defined location] – and make sure someone besides you knows where that is.