Equipment Maintenance Log Template (Free)
Log – Equipment Maintenance
Every piece of equipment has a maintenance story – this log is where it’s written. Planned jobs, breakdowns, and the food-safety checks that have to happen before the line restarts.
Instructions: Log every maintenance job: planned or breakdown. Record what was done, parts used, and the post-maintenance check before restart. QA or production signs the food-safety release – the line doesn’t restart on a verbal ‘all good’.
Record details
- Equipment:
- Location:
- Month:
Acceptance criteria
Anything outside these criteria is a deviation – act, record, and tell QA.
- Post-maintenance hygiene check passed before restart
- Food-grade lubricants used near food zones
- All tools and parts accounted for
Log
| Date | Job type (planned / breakdown) | Description of work | Parts used | Post-maintenance check OK? | Released by | Initials |
|---|---|---|---|---|---|---|
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
| [Date] | [Job type (planned / breakdown)] | [Description of work] | [Parts used] | [Post-maintenance check OK?] | [Released by] | [Initials] |
Notes and corrective action
Breakdown patterns in this log are preventive-maintenance gold – three seal failures on the same machine is a replacement decision waiting to be made, not bad luck.
- [Describe any deviation, action taken, and product disposition.]
Review
| Reviewed by (name / signature) | Date | Comments |
|---|---|---|
| [Name / Signature] | [YYYY-MM-DD] | [Comments] |