Eliminate Biological Cross-Contamination Structurally
Perform a thorough GAP analysis on your facility’s layout before BRCGS or FSSC unannounced audits. Covers employee routing, drainage flow direction, and high-care positive air pressures.
Features included:
- 15-point structural zoning review checklist.
- Drainage and plumbing separation audit logs.
- Air locks and hygiene vestibule criteria guidelines.